AI assistance in software development is changing not only how code is created, but also where the work falls within a project. A current guide article on Golem.de describes the development using the example of the Scrum Master role: AI does not make it superfluous, but it takes on additional tasks – with the risk of sinking into micromanagement.
This observation fits a pattern seen in many projects: tools that speed up individual work steps shift the bottleneck instead of resolving it. If development teams deliver results faster, decisions, coordination and reviews must also happen faster.
The bottleneck moves forward and backward
Accelerated implementation increases pressure at two points in the process. First, on the upstream clarification: requirements, acceptance criteria and business decisions must be available at shorter intervals. Second, on the downstream review: code review, test coverage, security and data protection issues, and business sign-off.
Anyone who optimises only the implementation merely shifts waiting times. The noticeable productivity gain only emerges when clarification and review grow alongside it – organisationally, not just technically.
Why coordination roles come under pressure
Scrum Masters, Product Owners or project managers are precisely the roles that mediate between the business side, development and operations. As the pace increases, so does the number of coordination meetings, follow-up questions and status requests. Without clear rules, this quickly produces a reflex: more control, more queries, more detailed steering.
Micromanagement – that is, closely steering individual work steps instead of the framework conditions – is rarely ill will, but a reaction to a lack of transparency. It costs twice over: the coordination role becomes a bottleneck, and the team loses ownership.
What changes concretely in client projects
For projects in mid-sized companies, some practical consequences can be derived from this:
- Shorten decision paths. If implementation takes days instead of weeks, a business sign-off must not take several weeks. Fixed decision windows and clearly named decision-makers help more than additional meetings.
- Plan review as its own capacity. Code review and business sign-off are work and need a time budget. If AI-assisted work produces more, this budget must grow alongside it.
- Sharpen the Definition of Done. The faster results are produced, the more important a shared, verifiable definition of when something is done becomes – including tests, documentation and accessibility requirements.
- Transparency instead of queries. A current, honest project status in the ticket system reduces status requests more effectively than any additional reporting.
Redefine roles instead of cutting positions
The obvious conclusion that AI replaces coordination roles falls short. More plausible is a shift in focus: away from the pure organisation of appointments and artefacts, towards moderating decisions, quality assurance within the process and the question of which results are actually reliable.
This brings to the fore a capability that has so far been rather marginal: being able to assess results from AI-assisted work. This applies to code suggestions as well as to generated texts, test cases or analyses. Anyone who does not organise this assessment shifts risk into later project phases – to where corrections become expensive.
A pragmatic start
Before introducing further tools, a sober stocktake is worthwhile. Three questions are enough to begin with:
- Where do tasks currently wait the longest – in implementation, in clarification or in sign-off?
- Who actually decides there, and how long does a decision take on average?
- Which review steps are mandatory, and which happen informally as availability allows?
Only once these points are clarified can a sound assessment be made of where AI support has an effect and where it merely creates additional coordination effort.
Assessment
For web and software projects, this means: the benefit of AI tools is decided less by the tool itself than by the project organisation behind it. Those who adapt roles, decision paths and review steps to the higher pace gain speed that arrives in the result. Those who do not produce interim states faster, which then wait longer for approval.